OSGS completed the design and build of a new 2000 m3/hr Nitrogen during 2019 out of our Sydney plant.

The package is designed to deliver 2,000 m3/hr at 97% and operates unattended 24/7, with remote monitoring and control.

The nitrogen plant, weighting a total of over 40 Tonne with a footprint of approx. 16.5m x 16.7m, was designed and built during 2019.  it was commissioned on site in August 2019 on a coal mine in Queensland.

 

   

 

 

 