PRODUCT 2000m3/hr Nitrogen package – coal mine inertisation (2020 builds)

On Site Gas Systems completed the build of a further two, 2000 m3/hr Nitrogen packages during 2020 out of our Sydney plant.

The packages are identical and are designed to deliver up to 2,000 m3/hr at 97% and operate unattended 24/7, with remote monitoring and control.

The nitrogen plants, weighting a total of over 40 Tonne with a footprint of approx. 16.5m x 16.7m, were designed and built during 2020with one being commissioned on site late 2020 and the other in early 2021 when the sites surface infrastructure was ready.

 

 

    

 

 

 

 

 